Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 8604

control over reservations.

$
0
0

Hi Gurus,

 

i have some doubts about the use of stock reservations. i have set 3  in Reservation/purchase req of OPL8. so the stock is getting reserved whenever i release a Production order.

 

hear i have a scenario. i need two Raw Meterials To produce a FG. i have  stock of 100  each of theseTwo Raw Materials.

 

Now I created a Prodcuction oeder For 50 FG Material. if I check the Stock in MMBE it showing 50 As reserved.

 

i created Another production oder for 100 Fg Material. if I check In MMBE it is Showing 150 as Reserved stock. If I try to do GI for the second Order Without issueing to First Order. systm is allowing to Do I think This is Standars Behaviour of the System.

 

My doubt is how can we control that GOODS Issue not to happen to the next production order whan a production order exist with a reservation.

 

system should not allow the Reserved goods  to issue to one order to another upcoming order,

 

Thanks&Regards,

Mahesh.


Viewing all articles
Browse latest Browse all 8604

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>