Re: MRP area type

$
0
0

Thanks Caetano.

Does this mean that all materials in same plant will automatically have the same MRP area?

I was trying to create MRP area, so that I can assign it to few of the plants and run MRP for only those plants via scope of planning.

However, that doesnt seem to be the correct approach. This can only be done if I need to consider storage locations. Is that correct?

 

Best Regards,

Neha